SPECIFICATION FOR LIFE SAFETY ALARM MONITORING

Category – 5

Dubai Civil Defence has made a commitment to enhance Life Safety and National Security in Dubai by implementing a 24x7x365 Remote Monitoring System (RMS).

RMS will detect and report alarms in real time from Fire and Fire Fighting Systems, Lift and Gas detection systems in residential, domestic, commercial and industrial buildings.

The project includes the entire Emirate of Dubai and covers every type of buildings right from Warehouses to high rise buildings. Project will be using state of the art technology (M2M) to automatically send alarm signals in case of emergency. Information including exact details on alarm location and status will be provided to DCD for immediate response.

The buildings/sheds are divided into different categories. The specifications for Buildings/sheds falling within Category 5 are as follows:

Buildings with any of the following parameters are specified as Category-5.

  1. Buildings with gross area above 200,000 sq ft
  2. Buildings with twenty one floors and more
  3. Multiple Room Commercial Establishments.
  4. Industrial sheds with area of more than 200,000 sq ft.
  5. Industrial Facility with Hazardous material (irrespective of area)
  6. A building with no or multiple interface panel.(irrespective of area and Floors)

The cost of installation and monitoring for the Remote Monitoring System (RMS) will be calculated as a combination of category 1 to category 4 depending on the technical feasibility and building specific conditions observed during the survey of the building. Any Category-5 building may have the following alarm monitoring systems:

  1. Addressable based Fire Alarm System with minimum floor wise zoning and open protocol connectivity as described in Section 1.4
  2. Fire Pumps
  3. Fire Water Tank Low Level
  4. Lifts
  5. Gas Detection

Subscriber should provide a single Interface Panel for interfacing to the Dubai Civil Defence monitoring panel. The Interface Panel shall have the following capability.

  1. Open Protocol connectivity as described in section 1.4 from Addressable fire alarm panels in the event of Fire Alarm System not being connected to BMS.
  2. Open Protocol connectivity as described in section 1.4 from buildings having a BMS.
  3. Separate Volt free contacts (VFC) per fire alarm panel (in case of a networked fire alarm system) for the following points. The state of the VFC should ideally be Closed (NC) during normal condition and Open (NO) during alarm condition.
    • Common Fire Alarm within the building
    • Common Fire Alarm System Fault.
  4. Separate Volt free contacts (VFC) for the following points in the event of the points not being connected to BMS. The state of the VFC should ideally be Closed (NC) during normal condition and Open (NO) during alarm condition.
    • One alarm point per floor/zone for fire alarm(In case of fire alarm panel not being able to provide open protocols)
    • Fire Water Tank Low Level
    • Individual Lift Alarm
    • Individual Lift Fault
    • Individual Fire Pump Run Statu
    • Individual Fire Pump Fault Status
    • Gas Detection System Common Alarm
    • Gas Detection System Common Fault.
    • Common Alarm from specialized Fire Systems.
  5. Proper terminals for connectivity.
  6. 230VAC power supply terminals within the interface panel.
  7. Proper electrical earth.
  8. Interface panel should be located next to proposed place of installation of Civil Defence alarm panel.
  9. Containment till the Location of Civil Defence alarm panel.

BMS Requirements

Buildings having a BMS should have the provision to monitor the following points in the building:

  1. Fire Alarm per floor including basement
  2. Common Fire Alarm system Fault
  3. Fire Water Tank Low Level
  4. Individual Lift Fault
  5. Individual Lift Passenger Alarms
  6. Individual Fire Pump Running Status
  7. Individual Fire Pump Trip Status
  8. Fire Water Line Low Pressure Alarm
  9. Gas alarm per zone or floor
  10. Common Gas Alarm System Fault.
  11. Common Alarm from specialized Fire Systems

The BMS shall integrate to the Dubai Civil Defence Alarm Panel using open protocols as defined below. The BMS shall expose all the above mentioned points as Digital values to the Dubai Civil Defence Alarm Panel using any of the open protocols defined below:

Open protocols:

  1. Bacnet IP
  2. Bacnet MSTP
  3. Modbus TCP
  4. Modbus RTU over three wire RS485 – Proper Modbus registers to be provided for each monitoring point.
  5. Lonworks

Interface Panel Location

The Interface Panel should be located next to the Dubai Civil Defence Alarm Panel location. The location shall be based as per following

  1. There shall be excellent GPRS signal coverage at the location.
  2. The location should be on any floor on or above the ground floor.
  3. Location shall be within the building and not outside
  4. The panel shall be easily accessible

Dubai Civil Defence Panel Location

Proper space shall be provided for the Dubai Civil Defence Panel Location within the building as per the following

  1. A minimum space of 800mm X 800mm X 500mm shall be provided.
  2. The space shall be provided on the wall at least 1.5 mtrs above floor level
  3. The space shall be provided next to the Interface Panel within a maximum distance of 2 mtrs.
  4. The location shall have excellent GPRS signal coverage.

Important Information

  1. All Contractors/Building Owners to subscribe at DCD counter.
  2. Survey will be conducted within 7 working days of date of subscription.
  3. Building category will be decided after survey.
  4. The subscriber will need to rectify all snags identified during survey within 48 hrs.
  5. Subscriber will make the payments at DCD cash counter.
  6. For multi-tenanted industrial sheds/building with common fire alarm panel, the subscription charges will be borne by the owner. Tenant need to produce the photocopy of the receipt towards payments of subscription charges, duly endorsed by the owner. Owner’s endorsement will be considered as acceptance of owner towards tenant’s area being covered by the centralized fire alarm system.
  7. Individual tenants with their own fire alarm system will pay for the subscription charges as per determined category.
  8. It is mandatory that Industrial sheds with hazardous materials should have a separate panel for the area of the storage.
  9. Depending upon the type of material stored, multi tenanted industrial sheds might be required to install a separate Fire alarm panel and it will be at the sole discretion of Dubai Civil Defence.
  10. It is recommended that all buildings falling in category-4 and above should have an addressable fire alarm system installed covering the entire buildup area.

Note

This document is only a guideline. Depending upon the size, location and utilities of a property, Dubai Civil Defence has the discretion of advising the systems to be installed for the safety of life and property. Accordingly the property can consider in a Category at the sole discretion of Dubai Civil Defence.